On 27/11/2017, the delegation includes Mr. Luong Van Hai – Vice Chairman of People's Committee of Binh Thuan province, Mr. Nguyen Tai Anh – Vice President  of Vietnam  Electricity, representatives of provincial departments, Power Generation Corporation 3 came to check and witness 3 completed lines of the trial production operation of adobe brick from ash of Vinh Tan 2 Thermal Power Plant . 

On 27/11/2017, the delegation includes Mr. Luong Van Hai – Vice Chairman of People's Committee of Binh Thuan province, Mr. Nguyen Tai Anh – Vice President  of Vietnam  Electricity, representatives of provincial departments, Power Generation Corporation 3 came to check and witness 3 completed lines of the trial production operation of adobe brick from ash of Vinh Tan 2 Thermal Power Plant . 

At first, the entire brick produced from the lines will be used for building the factory of Mai Xanh Company manufacture. As planned, from 12/2017, the factory will consume about 600 tons of ash/day. Mai Xanh Company is now building the second and the other remaining factories. As plan, the end of 3/2018, Mai Xanh will keep on installing and alternately putting into operation of the other 25 lines to consume 100% of ash produced daily by Vinh Tan 2 Thermal plant. 

Mai Xanh Investment JSC’s trial operation of producing adobe brick has plays an important role for resolving the problem of consuming ash produced by Vinh Tan 2 thermal power plant as well as other thermal plants at the Vinh Tan Power Center

CONTACT INFO:
Power Generation Corporation 3
Address: Phu My 1 Industrial Park, Phu My Town, Tan Thanh District, Ba Ria - Vung Tau Province
Phone: 0254. 3876927 Fax: 0254. 3876930
Vinh Tan Thermal Power Company
Address: Vinh Tan 2 Thermal Power Plant campus, Vinh Phuc village, Vinh Tan Commune, Tuy Phong District, Binh Thuan Province.
Phone: 0252. 3962.677 Fax: 0252. 3962.678

Another news

PRODUCTION, BUSINESS, AND INVESTMENT CONSTRUCTION SITUATION IN FEBRUARY AND OBJECTIVES, TASKS OF THE MARCH 2032 PLAN

The electricity output achieved in February 2023 by the company is 2.471 billion kWh, reaching 96.21% of the monthly plan, with an average of 88.2 million kWh per day

PRODUCTION AND BUSINESS INVESTMENT CONSTRUCTION SITUATION IN JANUARY AND OBJECTIVES, TASKS OF THE FEBRUARY 2023 PLAN

In January 2023, the total electricity production of the company reached 2.145 billion kWh, achieving 87.6% of the monthly plan. The average daily production was 69.2 million kWh, which accounted for 88.43% compared to the same period in 2022.

PRODUCTION, BUSINESS, AND INVESTMENT CONSTRUCTION SITUATION IN NOVEMBER AND OBJECTIVES, TASKS OF THE DECEMBER 2022 PLAN

The electricity production in November 2022 by EVNGenco3 reached 2.834 billion kWh, achieving 115.33% of the monthly plan. Cumulatively for the first 11 months, it reached 29.672 billion kWh, meeting 93.16% of the annual plan.

SITUATION OF PRODUCTION, BUSINESS, INVESTMENT AND CONSTRUCTION IN NOVEMBER AND TARGETS, TASKS AND PLANS IN DECEMBER 2021

During the month, power plants of EVNGenco3 have successfully satisfied the mobilization of the National Load Dispatch Centre, ensured the safe and continuous power supply. EVNGenco3's power output in November 2021 is 2,441 billion kWh, reaching 88.75% of the plan. However, the load demand of the power system continues to be low due to the effects of the COVID-19 pandemic. Hydrological conditions are favorable, so plants of Buon Kuop Hydropower Company have mobilized on the basis of water flows.

SITUATION OF PRODUCTION, BUSINESS, INVESTMENT AND CONSTRUCTION IN THE FIRST 9 MONTHS OF 2021 AND TARGETS, TASKS AND PLANS IN OCTOBER 2021

 EVNGenco3's power output in September 2021 is 2.067 billion kWh, reaching 77.73% of the plan. The accumulated output in the first 9 months of 2021 is 22.562 billion kWh, reaching 68.98% of the year plan.

SITUATION OF PRODUCTION, BUSINESS, INVESTMENT AND CONSTRUCTION IN 2020 AND TARGETS, TASKS AND PLANS IN 2021

The generated power output in 2020 of EVNGENCO 3 is 33.254 billion kWh, of which, the accumulated output is 31.103 billion kWh, reaching 100.1% of the plan.