At 23:45 a.m. on July 31, 2020, after 31 days of downtime (from July 1st to July 31st, 2020), plant units of the Phu My 4 Thermal Power Plant were officially handed over to the National Load Dispatch Centre (A0) for putting into operation, after completing the overhaul as planned. This is the first time units have performed the repair of GT41 and ST43 plant units, 41 and 42 furnaces without the direct assistance of the GE’s manufacturing experts at the Site.
At 23:45 a.m. on July 31, 2020, after 31 days of downtime (from July 1st to July 31st, 2020), plant units of the Phu My 4 Thermal Power Plant were officially handed over to the National Load Dispatch Centre (A0) for putting into operation, after completing the overhaul as planned. This is the first time units have performed the repair of GT41 and ST43 plant units, 41 and 42 furnaces without the direct assistance of the GE’s manufacturing experts at the Site.
Phu My 4 Thermal Power Plant is one of four plant clusters under the management and operation of Phu My Thermal Power Company. The Plant is put into commercial operation from August 2004, the accumulated output as of the end of July 2020 is about 50 billion kWh. The plant has applied the combined-cycle gas turbine technology with the design capacity of 450MW and operating configuration of 2-2-1, including 02 GT13E2 gas turbines, each one’s capacity is 150MW, 02 heat recovery furnaces and 01 KA13E2 steam turbine unit with the capacity of 160 MW.

EVN officially receives Phu My 2.2 BOT Power Plant
04/02/2025 - 74 views

EVNGENCO3 successfully completes its task of electricity production in 2024
12/01/2025 - 51 views

EVNGENCO3’s 2024 Technical Management Conference
18/12/2024 - 169 views

The Journey of Connecting Generations at EVNGENCO3
18/12/2024 - 172 views

EVN officially receives Phu My 2.2 BOT Power Plant
04/02/2025 - 74 views

EVNGENCO3 successfully completes its task of electricity production in 2024
12/01/2025 - 51 views

EVNGENCO3’s 2024 Technical Management Conference
18/12/2024 - 169 views

The Journey of Connecting Generations at EVNGENCO3
18/12/2024 - 172 views

EVN officially receives Phu My 2.2 BOT Power Plant
04/02/2025 - 74 views

EVNGENCO3 successfully completes its task of electricity production in 2024
12/01/2025 - 51 views

EVNGENCO3’s 2024 Technical Management Conference
18/12/2024 - 169 views

The Journey of Connecting Generations at EVNGENCO3
18/12/2024 - 172 views