Under the cooperation program between the two governments of Vietnam and Korea, on the occasion of the official visit to Vietnam of Korean President Moon Jae-in, on 22nd March, in Hanoi. (EVN) - Vietnam Electricity (EVN) has signed a Memorandum of Understanding (MOU) with Kepco KPS - a subsidiary of Korea Electric Power Corporation in the presence of Minister of Trade and Industry Tran Tuan Anh and Mr. Paik Un Gyu - Minister of Trade, Industry and Energy of Korea.

Chairman of EVN's Board of Members Duong Quang Thanh (left) has signed the MOU with the leader South Korea's Electricity Corporation and of Korea's Doosan Heavy Industries and Construction Corporation
Deputy General Director of EVN - Ngo Son Hai (left) signs MoU on cooperation in the field of electricity with the National Power Group of Korea
Over the years, the Korea Electric Group has been involved in many of Vietnam's power projects and contributed significantly to the development of Vietnam's power industry. Based on this good tradition and in order to implement EVNGENCO 3’s policy of promoting and developing the technology of repairing power plants EPS promoted activities of cooperating with Kepco KPS to develop technical technologies in the field of power plant refurbishment.
Mr. Cao Minh Trung - Vice President of Power General Corporation 3 cum Director of EPS Company (Left)

EVN officially receives Phu My 2.2 BOT Power Plant
04/02/2025 - 74 views

EVNGENCO3 successfully completes its task of electricity production in 2024
12/01/2025 - 51 views

EVNGENCO3’s 2024 Technical Management Conference
18/12/2024 - 169 views

The Journey of Connecting Generations at EVNGENCO3
18/12/2024 - 172 views

EVN officially receives Phu My 2.2 BOT Power Plant
04/02/2025 - 74 views

EVNGENCO3 successfully completes its task of electricity production in 2024
12/01/2025 - 51 views

EVNGENCO3’s 2024 Technical Management Conference
18/12/2024 - 169 views

The Journey of Connecting Generations at EVNGENCO3
18/12/2024 - 172 views

EVN officially receives Phu My 2.2 BOT Power Plant
04/02/2025 - 74 views

EVNGENCO3 successfully completes its task of electricity production in 2024
12/01/2025 - 51 views

EVNGENCO3’s 2024 Technical Management Conference
18/12/2024 - 169 views

The Journey of Connecting Generations at EVNGENCO3
18/12/2024 - 172 views