Vinh Tan 4 Thermal Power Plant

Address:

Vinh Tan Commune, Tuy Phong Dist., Binh Thuan Province

Capacity: 2 x 600 MW

Commence date: 9 Mar., 2014

First Synch Unit 1: Dec., 2017

First Synch Unit 2: June, 2018

Project management consultant: 

Vinh Tan Thermal Power Project Management Board  

Vinh Tan 4 Thermal Power Plant  is one of the imperative projects to address the power shortage in the South from 2018 of the Government. The project is owned by EVN and EVNGENCO 3 involves in as a project management consultant. Total investment of  the project to be VND 36,000 billion with total installed capacity of 1.200 MW (2x600MW), a production capacity of 7.2 billion kWh per year. This project is of great significance, marking a new development step for Vietnam's electricity industry with some outstanding features such as being the coal fired power plant using a huge number of quantity of coal, being the first power plant using the super-critical technology, the project having the highest  proportion of local involvement, the first large-scale thermal power project designed by the Vietnam consulting agency .


 Contact
 028 3636 7449
 genco3@genco3.evn.vn